Installation of the first precast concrete panels above the Performance Hall stage (left). Masonry installation at the Performance Hall south exterior wall (right).


|
July 5, 2003 Installation of the first precast concrete panels above the Performance Hall stage (left). Masonry installation at the Performance Hall south exterior wall (right).
![]() ![]() |